Tesla to cap battery at 80% charge in high-usage Supercharger stations to increase site throughput

Tesla has recently announced that it is rolling out an update to improve the throughput of its busiest Superchargers stations in North America by up to 34%. With the new optimizations in place, the electric car maker’s expansive charging network would be capable of serving significantly more vehicles that are taking long trips.

When Tesla announced the Supercharger V3 network back in March, the company mentioned that “with thousands of new Superchargers coming online in 2019, the launch of V3, and other changes we’re making to improve throughput, the Supercharger network will be able to serve more than 2x more vehicles per day at the end of 2019 compared with today – easily keeping pace with our 2019 fleet growth.”

(Photo: Tesla)

Among the ways for Tesla to improve the throughput of its Superchargers is to cap the charging sessions of the company’s electric cars at 80%. According to a Tesla spokesperson, the updated Superchargers will charge a vehicle’s battery very quickly until 80%, after which the charging session ends. Provided that owners utilize Tesla’s Trip Planner, electric car owners would still be able to charge up to 100%, though charging from 80-100% will be at a slower rate.

Tesla is actively integrating this system on the Trip Planner feature of its vehicles, allowing drivers to follow an efficient route to their destinations without unnecessary delays. A Tesla spokesperson noted that these changes would be affecting around 8% of North American Supercharging sites full time, as well as another 9% of sites during the holidays when long trips among Tesla owners are common.

With the continued growth of the Model 3 and the upcoming arrival of the Model Y, Tesla would need a charging network that can accommodate its fleet on a constant basis. With thousands of Teslas on the road, it is pertinent for vehicles to only stop by the company’s Superchargers for short breaks. Supercharger V3, which features the electric car maker’s fastest charging system at 250 kW, could open the doors to charging stops that are only about 15 minutes. 

Just like its electric cars, Tesla’s Superchargers are also in a constant state of improvement. Last month alone, Tesla began rolling out updates to its existing Supercharger V2 network, such as unlocking a 150 kW peak charge rate from charging infrastructure. Tesla has also introduced systems that optimize the heat of its vehicles’ batteries such as On Route Battery Warmup for the Model S and X, which helps vehicles charge at an optimal rate as soon as they are plugged into a Supercharger.

Tesla to cap battery at 80% charge in high-usage Supercharger stations to increase site throughput

<!–

View Comments

–>

Source

Elon Musk’s Boring Company updates loop system using Teslas on Autopilot

A new teaser video released by The Boring Company has provided a glimpse of the tunneling startup’s updated concept for its loop system, which is designed to carry commuters from one point to another. The Boring Company’s new teaser showed a Tesla Model 3 simply traversing the length of a transport tunnel using Autopilot, reaching speeds of up to 127 mph.

The Boring Company’s new teaser featured a comparison between two Model 3s traveling from what appeared to be the corner of Prairie & 120th Street to the corner of Crenshaw & 12259 Rocket Rd in Hawthorne, CA. The results of the comparison were notable, with the Model 3 using the tunnel completing the journey in 1:36:02 and the vehicle traveling above ground completing the route in 4:44:98.

In later comments, Elon Musk noted that the Model 3 which utilized the tunnel was not using the electric skates present in the Model X units that were demonstrated last December during the Hawthorne test tunnel’s opening party. Instead, the vehicle in the new teaser simply had Autopilot enabled as it traveled through the tunnel. With this setup, the electric sedan was able to reach a maximum speed of 127 mph. Compared to the rather bumpy tunnel rides in the Hawthorne test tunnel’s opening party, the Model 3’s journey in the recent teaser appeared to be far smoother.

When asked why The Boring Company opted to use Teslas on Autopilot for its transport tunnel, Musk noted that the solution was “simple and just works.” This bodes well for The Boring Company’s other upcoming projects such as the LVCC Loop in Las Vegas, which is less than a mile long and expected to be completed by the end of the year. By using Teslas on Autopilot, The Boring Company’s projects will likely become much quicker to complete, considering that transport tunnels will no longer require rails.

The Boring Company’s loop system, which is intended to transport multiple passengers, has undergone several iterations over the years. Initial concepts from the tunneling startup show vehicles riding on sleds that traveled at speeds of up to 124 mph. During the Boring Company’s unveiling party for its Hawthorne test tunnel last December, the company showcased a concept that utilized electric skates which are directly attached to vehicles that traveled in the transport tunnel. The startup’s most recent iteration of its loop system concept removes skates altogether.

The changes in The Boring Company’s concepts for the loop system all but show the tunneling startup’s tendency to continually innovate. With this in mind, it would not be surprising if Elon Musk’s tunneling startup comes up with yet more updates to its transport tunnels and its loop system in the near future.

Here’s a look at the evolution of The Boring Company’s transport tunnel concepts.

[embedded content]
[embedded content]
[embedded content]

Elon Musk’s Boring Company updates loop system using Teslas on Autopilot

<!–

View Comments

–>

Source

Tesla opens jobs for Gigafactory 3 as first images of factory interior emerge

Ahead of the completion of Gigafactory 3’s outer shell in Shanghai, Tesla’s recruitment team in China has announced that it will be holding a special job fair on May 29. Tesla noted that it would be looking for applicants for 25 different job positions, each of which will be working under one of six departments when the site begins its operations.

These departments are the stamping workshop, welding shop, paint shop, assembly, facility operation, and logistics. Numerous jobs are up for grabs in each of these departments, with Tesla’s announcement featuring openings for welding press technicians, equipment repair technicians, production monitors, and squad leaders, to name but a few.  

Quite interestingly, Tesla’s job fair announcement for Gigafactory 3 includes references to Elon Musk’s idea of an “Alien Dreadnought” ship. The alien dreadnought is the CEO’s idea of a hyper-automated factory that is essentially a machine that builds the machine. Musk has mentioned this concept to Chinese Premier Li Keqiang in Beijing back in January, and it was received with much optimism.

Tesla’s complete list of job listings for its upcoming Gigafactory 3 job fair could be accessed here.

Apart from announcing a job fair, Tesla and its construction partner appear to have made significant progress in the construction of Gigafactory 3’s interior. Over the past weeks, the construction of Gigafactory 3 has hit overdrive as China’s workforce attempted to complete the Phase 1 area’s initial construction by the end of May. As the general assembly building takes form, work has shifted inside the nearly completed factory shell.

The pictures of Gigafactory 3’s interior reveal that some parts of the expansive general assembly building’s floors have already been paved with cement. Pillars on the site also look finished and refined. Overall, the interior of the general assembly building looks the part of a large factory before manufacturing equipment is installed.

It remains to be seen if China’s workforce could meet the targets set by Shanghai officials last March, which estimated that Gigafactory 3’s initial construction could be completed by May. Despite this ambitious timeframe, the incredible pace of Gigafactory 3’s construction, which allowed the facility to grow from a single pillar in the middle of March to a full-blown factory shell by May, is something that could very well make it to books. At its current pace, and barring unexpected delays, Gigafactory 3 could see initial electric car production as early as September.

Watch the most recent drone flyover of Gigafactory 3 in the video below.

[embedded content]

Tesla opens jobs for Gigafactory 3 as first images of factory interior emerge

<!–

View Comments

–>

Source